Recently, the Security Committee Office of the State Council recently issued the "construction of the field of prevention and construction of mechanical scaffolding and other accidents special rectification work program" (hereinafter referred to as the program). "Plan" said that the crane is not detected, acceptance or detection of the use of the unqualified, the special rectification time of 4-12 months.
The quality of the scaffold and the electric hoist crane is not qualified is one of the causes of the accident.. April 5, Baqiao District, Xi'an city a in the construction site in, two scaffolders from the 22nd floor fall dead. The cause of the event is tilt the scaffolding. And March 4, the river group, the construction of the Yangtze River International Garden Phase II site (Wuxi) scaffold collapse, causing casualties, become Jiangsu Province listed on the supervision of the production safety accidents.
In the remediation program, the reporter noted that for electric hoist crane and scaffold quality has a clear requirement.
"Program", said to urge enterprises to improve the construction of electric hoist crane technology file system, strictly from the heavy equipment and scaffolding acceptance system, perfect to play heavy machinery, scaffolding on-site management and supervision of construction work supervision and inspection system. Electric hoist crane without detection, acceptance or detection of the use of the unqualified, scaffold and scaffold use of steel pipe, fastener, etc. do not comply with the relevant standards and specifications shall not use.
近日,國務院安委辦于近日印發(fā)了《工程建設領域預防施工起重機械腳手架等坍塌事故專項整治工作方案》(以下簡稱《方案》)?!斗桨浮繁硎荆鹬貦C械未經(jīng)檢測、驗收或檢測不合格的不得使用,此次專項整治的時間為4-12月。
腳手架和電動葫蘆的質(zhì)量不合格是導致此類事故發(fā)生的原因之一。4月5日西安市灞橋區(qū)一在建工地內(nèi),就出現(xiàn)了兩名架子工從22樓墜亡的事件,事件的原因是腳手架出現(xiàn)傾斜。而3月4日江中集團承建的長江國際花園二期工地(無錫新區(qū))腳手架坍塌事故,也造成了人員傷亡,成為江蘇省掛牌督辦的安全生產(chǎn)事故。